Hardline, High-Split & Node Literacy Exam

30 questions on hardline prep, taps, AOI LEs, bridgers, and high-split. Suggested time 60 minutes. Target score: 80%.

Final examination

Select an answer, then lock it in. Questions unlock one at a time — finish each before the next. Answer positions are shuffled every attempt.

0 / 30
0 correct

Q1. A hardline tech's primary contribution to plant health is:

Q2. Correct forward-path order from content origin to customer:

Finish Q1 first

Q3. Meter reads +31 dBmV at a −20 dB amplifier test point. Approximate true RF level:

Finish Q1 first

Q4. Why can one open tap port degrade upstream for an entire node segment?

Finish Q1 first

Q5. Before you core, the tool must be:

Finish Q1 first

Q6. The coring tool rocks and the slug comes out angled. Correct action:

Finish Q1 first

Q7. Seizure serrations must bite:

Finish Q1 first

Q8. After torque, the connector body still spins on the cable. That means:

Finish Q1 first

Q9. Opening an old splice shows green corrosion on the center conductor. You should:

Finish Q1 first

Q10. A tap faceplate stamped '17' indicates:

Finish Q1 first

Q11. Which passive merges 60/90 VAC plant power onto the coax while passing RF?

Finish Q1 first

Q12. Pad vs equalizer — which statement is true?

Finish Q1 first

Q13. On an AOI QuantumLink LE, before pulling the RF module you must:

Finish Q1 first

Q14. Replacing a failed amp — FIRST action at the open housing:

Finish Q1 first

Q15. In a typical Spectrum-style high-split upgrade, usable upstream extends near:

Finish Q1 first

Q16. High-split makes connector discipline MORE critical because:

Finish Q1 first

Q17. Inside an amplifier, the physical part that sets the 42 / 85 / 204 MHz split is the:

Finish Q1 first

Q18. A line extender primarily:

Finish Q1 first

Q19. Three streets on one node: slow uploads after rain, normal forward levels, return ingress 15–35 MHz, wet hardline splice yesterday. Best first move:

Finish Q1 first

Q20. A Viavi OneExpert ingress scan is primarily used to:

Finish Q1 first

Q21. Good forward level but terrible MER at a tap most likely means:

Finish Q1 first

Q22. Hardline plant power is typically:

Finish Q1 first

Q23. Correct unit pairing:

Finish Q1 first

Q24. Green APC fiber connectors matter in HFC optics because they:

Finish Q1 first

Q25. Remote PHY / DAA changes architecture by:

Finish Q1 first

Q26. Flooding compound left on the outer conductor before seizure install causes:

Finish Q1 first

Q27. Jacket print is unreadable. Best way to verify hardline size before coring:

Finish Q1 first

Q28. Positive stop on a pin connector exists to:

Finish Q1 first

Q29. Which symptom set points to a return-path (upstream) problem first?

Finish Q1 first

Q30. Unused F-ports on a tap or amp faceplate must be:

Finish Q1 first
Answer all 30 questions to unlock module completion and the next lesson. Remaining: 30.